Case study
Beckett deal-diligence platform
An agentic diligence platform for an early-stage CPG venture fund. It is still the fund’s standard diligence process. Average diligence time fell from about 60 hours per deal to about 25, roughly 58% less. The sample is small: 4 deals before and 4 after.
All deal data, company names and fund figures omitted.
Every fact carries its source document, page, date and the exact original wording. Where no document supports a claim, it says so.
| Fact | Value | Source document | Page | Date | Exact quote | Provenance |
|---|---|---|---|---|---|---|
| Retail distribution | ~1,200 doors | Example Crisps retail distribution summary | 14 | 2025-03-12 | “Example Crisps products are stocked in approximately 1,200 doors across two regional chains.” | DOC-SOURCED |
| Active SKUs | 18 SKUs | Example Crisps Co. website, product page | n/a (web) | 2025-05-06 | “Browse all 18 flavors and pack sizes.” | WEB-VERIFIED |
| Second co-packer | Planned, not confirmed | Management call notes | 2 | 2025-04-02 | “We expect to add a second co-packer before the fall reset.” | UNVERIFIED |
Specialists work from the fact basis, then the committee reviews their findings. A custom Python orchestrator runs the stages.
- adversarial reviewer CRITICAL CONDITIONAL APPROVE
The second co-packer rests on one management statement with no supporting document.
- associate INFO APPROVE
Door count and SKU count both trace to a source and a date.
- partner WARNING CONDITIONAL APPROVE
Proceed once the co-packer plan is confirmed in a document.
Combined verdict: CONDITIONAL APPROVE
The model writes its reasoning to a separate journal, with my responses.
- stage
- committee review
- hypotheses_considered
- The co-packer statement is a plan; or it is already signed and only the document is missing.
- dead_ends
- No signed co-packer agreement among the company documents.
- resolution
- Keep the fact as UNVERIFIED and raise a CRITICAL finding until a document confirms it.
- principle
- A capacity plan is not capacity.
- generalization
- Ask for a signed agreement before a memo relies on planned capacity.
- confidence
- medium
Retrospective lesson: ask for a signed agreement before a memo relies on planned capacity.
The model writes this journal, with my responses; I have run the retrospective by hand so far.
How it works
- Knowledge base. Prior deal data, licensed market data and industry research, and the target company’s own documents.
- Two-layer retrieval. Structured fact tables that can be queried like a database, plus a pgvector database of chunked embeddings for semantic matching. Retrieval uses parent-child chunking: it finds small chunks and returns the full parent passage. Chunks are split by headings and chapters, a whole table stays in one chunk, and the target size is about 500–700 tokens.
- Tables. A parser pulls tables out before embedding, and their data is also structured into SQL and JSON. That fact basis is what review agents check against and what drafting agents work from.
- Provenance. Every chunk and every fact carries its source, page, document name, date and exact original wording.
Agents
- Specialists: valuation and model builders, drafting agents that each own one memo section, judge agents, and critics.
- A committee that reviews the full package, with distinct roles: an adversarial reviewer, an associate, a partner and others.
- One orchestrator, in custom Python rather than an agent framework, runs the stages. The model writes its reasoning to a separate journal, with my responses, so the reasoning can be reviewed independently of the result.
- A retrospective reviews that journal after a deal and records lessons for the next diligence; so far I have run it by hand.
Engineering
Stages are idempotent and resumable. The harness is model- and provider-agnostic: OpenAI, Anthropic or local models, assignable per role.
My role
I designed, directed and approved the platform. I set the direction, designed the system and the agent flow, inspected the work, approved the pull requests, and was the final judge of quality on the financial models and memos. The technical decisions that were mine: the database schema, the embedding model, the chunking strategy, the repo and branching workflow, and the evaluation protocol.
Evaluation
- Development benchmark, not a held-out test. My 4 hand-written diligence reports were the benchmark. The loop was to generate a report, compare it against mine, tune, and repeat on the next report and model.
- Embedding choice by experiment. In my tests, OpenAI text-embedding-3-large was not meaningfully better than text-embedding-3-small, so I selected small, which is about 6× cheaper.